Approved Modifications

<< first < previous | Page 1 | next > last >>
Mod.No. Description Approval date Issue Status Download PDF
1 Introduction of Pilot Light Drain Hole 04/11/1996 1
2 Introduction of Circular Rip Panel 1
3 Introduction of Temperature Streamer 1
4 Introduction of Nomex envelope base panels and load tape protectors 1
5 Introduction of revised Ripline arrangement 1
6 Introduction of dual feed fuel system 1
7 Introduction of cylinder strap slots in baskets 1
8 Introduction of Velcro blanking pieces in Rip 1
9 Introduction of extra long crown line 1
10 Introduction of locknuts on burner load frame shackles 1
11 Introduction of valve line stop piece 1
12 Introduction of special 4-way tee piece on burner 1
13 Reduction of basket size 1
14 Introduction of Heatshrink sleeving on "Talurit" Ferrules 1
15 Cancelled 1
16 Deletion of upper 'D' Rings 1
17 Introduction of Swivel Mounted Burner 1
18 Introduction of revised base tape 1
19 Introduction of pilot light quick release coupling 1
20 Introduction of extra large side vents 1
<< first < previous | Page 1 | next > last >>

Developed and Hosted By
SomCom Limited
Cameron Balloons Ltd., St. John Street, Bedminster, Bristol BS3 4NH, UK.
Tel: +44(0) 117 9637216 email: sales@cameronballoons.co.uk www.cameronballoons.co.uk